Integrations - Hexagon - Contracts

Hexagon – Using contracts


Open the contracts section


Navigate to the contracts section of Vantify CAFM:



Adding a new contract


Follow the steps from the contracts guide to add a new contract to the system. Set your dates, add a value, and add a file, as well as other important information.


You do not need to link your contract to a service provider, that is optional, so set any details as required. At the bottom of the page you’ll see the P2P information:



Work your way through the fields until the form is complete.


Note – if there is only one option per line, they will auto populate.


Apportioning the costs per visit


The bottom line allows you to split the value into different ratios, for example if it is billed quarterly this will be 25%, and you will add 4 of them. Click add line each time you need to add another:






NOTE – if you want to split it over 12 months, you will need to enter 8.33 11 times, and the final one needs to be 8.37


NOTE – the total ratio MUST add up to 100%. It will error if it is either below or above exactly 100% - it will not allow you to submit in this state.





Click submit when complete


The contract is now active and the value has sent to Hexagon which is summarised in the P2P tab on the contracts page:



NOTE - When processed changes to yes you know it has been sent to Hexagon


Related Guides

ELOGCAFM-N-60

ELOGCAFM-N-59


Vantify CAFM Support

For further assistance on anything covered in this guide or others, please contact the Vantify admin team on 01480 499740 or helpdesk.cafm@vantify.com.

This guide was created by Vantify's Product Team and reflects the latest updates as of the specified date. Please note that the information provided may evolve with future system updates or changes. Additionally, some details may vary based on your specific user permissions and account settings within Vantify.